From a strait closing to a customer email in minutes.

No black box. Every number on the screen can be traced back to the signal that moved it.

The model

Six steps, in plain English

SignalsVessel tracking, insurance, freight indices, notices, newsChokepoint intens…Scored per passage, 0–100Lane delaySummed across the chokepoints a lane crossesSupplier scoreDelay against buffer, weighted by single-sourcingOrder impactRevised ETA per purchase orderActionRanked mitigations and a drafted message

Signals

Vessel tracking, insurance, freight indices, notices, news

Chokepoint intensity

Scored per passage, 0–100

Lane delay

Summed across the chokepoints a lane crosses

Supplier score

Delay against buffer, weighted by single-sourcing

Order impact

Revised ETA per purchase order

Action

Ranked mitigations and a drafted message

Scoring

The risk score, explained

  1. 1

    Expected delay is the sum of disruption at every chokepoint the lane crosses. A lane through two contested passages carries both.

  2. 2

    That delay is compared against the stock buffer you hold for the part. Fourteen days of delay against thirty days of cover is an inconvenience; against seven days it is a stoppage.

  3. 3

    The result is weighted by how single-sourced the part is. A part with three qualified suppliers absorbs a delay that a sole-source part cannot.

  4. 4

    The output lands in one of three tiers: Stable, Elevated or Critical — with the contributing factors shown alongside, never the tier on its own.

Diversion logic

When a risk becomes a certainty

While carriers still use a route, disruption is probabilistic: some sailings are delayed, some are not. Once carriers stop using it, the added transit of the alternative applies to everything on that lane.

We model that switch explicitly, because the useful window is before it happens. Capacity on the alternative is cheapest and most available while everyone else is still waiting for an announcement.

Humans in the loop

Analysts review what matters

High-impact signals are reviewed by analysts before they move a forecast. Classification by model alone is fast and occasionally confidently wrong, which is an unhelpful combination when someone is deciding whether to air-freight a container.

You can override any chokepoint intensity yourself. Your override is recorded in the audit log alongside the model’s figure, so the disagreement is visible rather than silent.

Accuracy

How well it actually forecasts

Measured against a held-out test set, compared with the obvious alternative: predicting the historical median delay for the same lane.

Forecast accuracy of the delay model against a same-lane historical median baseline
MeasureBaselineModelWhat it means
Mean absolute error4.6 days2.8 daysAverage size of forecast error
Median absolute error3.4 days1.9 daysTypical error, less influenced by extreme cases
Forecasts within ±3 days48%71%Share close to the actual delay
Mean signed error−1.1 days−0.3 daysNegative values indicate underprediction
Coverage of 80% prediction interval—81%Actual delay falls within the range about four times in five
Mean interval width—7.2 daysHow broad the forecast ranges are
Test shipments
1,200
Test period
May – 28 September 2026
Completed shipments available
4,800
Cohort
60 production organisations

Baseline: Historical median delay for the same lane, from earlier records. Model: Gradient-boosted regression over lane, normal transit time, disruption indicators, congestion and diversion information. Uncertainty: Quantile predictions giving an 80% prediction interval.

Trained on June 2025 – February 2026, tuned on March – April 2026, and measured on a held-out test set from May – 28 September 2026 that the model never saw during training. Excluded from the evaluation: test accounts, duplicate shipments, missing arrival dates and cancelled shipments.

Two numbers there matter more than the headline. The 81% interval coverage against a nominal 80% means the stated range is honest: when the tool says it does not know precisely, it is right about not knowing. And the mean signed error of −0.3 days shows a slight remaining tendency to underpredict — worth knowing, since underprediction is the direction that costs you.

Three forecasts, followed through

Individual predictions from the test set, with what actually happened.

ShipmentOrganisationForecast issuedPredicted80% intervalActualError
VAL-001Alderbrook Trading10 May 20268 days5–12 days9 days1 day
VAL-002Bluehaven Components18 June 20264 days1–7 days6 days2 days
VAL-003Cedarfield Supplies7 July 202610 days6–15 days17 days7 days · outside interval

VAL-003 fell outside its stated range. At 81% coverage roughly one forecast in five is expected to, which is what a prediction interval means. Showing only the ones that landed would make the interval look better than it is.

Onboarding

Live in three weeks

Week 1

Data import

Supplier list, lanes, transit times, stock buffers and open purchase orders. A spreadsheet export is enough.

Week 2

Lane mapping and calibration

We map each lane to the chokepoints it crosses and calibrate expected transit against your own arrival history.

Week 3

Alerts live

Scores go live, thresholds are tuned to your tolerance, and alerts start reaching the people who act on them.

See it against your own lanes

We load a sample of your suppliers, run a live scenario, and show which orders would slip.